1 |
Service completion date/time, actual |
Actual date/time on which the service was completed. |
|
2 |
Delivery date/time, requested |
Date on which buyer requests goods to be delivered. |
|
3 |
Invoice date/time |
[2376] Date when a Commercial Invoice is issued. |
|
4 |
Order date/time |
[2010] Date when an order is issued. |
|
7 |
Effective date/time |
Date and/or time at which specified event or document becomes effective. |
|
8 |
Order received date/time |
Date/time when the purchase order is received by the seller. |
|
9 |
Processing date/time |
Date/time of processing. |
|
10 |
Shipment date/time, requested |
Date on which goods should be shipped or despatched by the supplier. |
|
11 |
Despatch date and/or time |
(2170) Date/time on which the goods are or are expected to be despatched or shipped. |
|
12 |
Terms discount due date/time |
Date by which payment should be made if discount terms are to apply. |
|
13 |
Terms net due date |
Date by which payment must be made. |
|
14 |
Payment date/time, deferred |
Date/time when instalments are due. |
|
15 |
Promotion start date/time |
Date/time when promotion activities begin. |
|
16 |
Promotion end date/time |
Date/time when promotion activities end. |
|
17 |
Delivery date/time, estimated |
Date and/or time when the shipper of the goods expects delivery will take place. |
|
18 |
Installation date/time/period |
The date/time/period of the act, or an instance of installing something or someone. |
|
35 |
Delivery date/time, actual |
Date/time on which goods or consignment are delivered at their destination. |
|
36 |
Expiry date |
Date of expiry of the validity of a referenced document, price information or any other referenced data element with a limited validity period. |
|
37 |
Ship not before date/time |
Goods should not be shipped before given date/time. |
|
38 |
Ship not later than date/time |
Date/time by which the goods should have been shipped. |
|
44 |
Availability |
Date/time when received item is available. |
|
50 |
Goods receipt date/time |
Date/time upon which the goods were received by a given party. |
|
55 |
Confirmed date/time |
Date/time which has been confirmed. |
|
58 |
Clearance date (Customs) |
(3080) Date on which Customs formalities necessary to allow goods to be exported, to enter home use, or to be placed under another Customs procedure has been accomplished (CCC). |
|
59 |
Inbond movement authorization date |
Inland movement authorization date. |
|
61 |
Cancel if not delivered by this date |
The date on which cancellation should take place, if delivery has not occurred. |
|
63 |
Delivery date/time, latest |
Date identifying a point of time after which goods shall not or will not be delivered. |
|
64 |
Delivery date/time, earliest |
Date identifying a point in time before which the goods shall not be delivered. |
|
67 |
Delivery date/time, current schedule |
Delivery Date deriving from actual schedule. |
|
69 |
Delivery date/time, promised for |
[2138] Date by which, or period within which, the merchandise should be delivered to the buyer, as agreed between the seller and the buyer (generic term). |
|
71 |
Delivery date/time, requested for (after and including) |
Delivery is requested to happen after or on given date. |
|
72 |
Delivery date/time, promised for (after and including) |
Delivery might take place earliest at given date. |
|
73 |
Guarantee period |
The period for which the guarantee is or will be granted. |
|
74 |
Delivery date/time, requested for (prior to and including) |
Delivery is requested to happen prior to or including the given date. |
|
75 |
Delivery date/time, promised for (prior to and including) |
Delivery might take place latest at given date. |
|
76 |
Delivery date/time, scheduled for |
The date/time for which delivery is scheduled. |
|
79 |
Shipment date/time, promised for |
Shipment might happen at given date/time. |
|
90 |
Report start date |
The date on which a report is to begin. |
|
91 |
Report end date |
The date on which a report is to end. |
|
94 |
Production/manufacture date |
Date on which goods are produced. |
|
95 |
Bill of lading date |
Date as specified on the bill of lading. |
|
99 |
Quotation opening date |
The date on which the quotation has been or may be opened. |
|
100 |
Product ageing period before delivery |
Period of time before delivery during which the product is ageing. |
|
102 |
Health problem period |
Period of time of health problem. |
GS1 Description: Period of time of exceptional health problems. |
|
117 |
Delivery date/time, first |
First possible date/time for delivery. |
|
119 |
Test completion date |
Date when a test has been completed. |
|
124 |
Despatch note date |
[2218] Date when a Despatch Note is issued. |
|
126 |
Contract date |
[2326] Date when a Contract is agreed. |
|
128 |
Delivery date/time, last |
Date when the last delivery should be or has been accomplished. |
|
129 |
Exportation date |
Date when imported vessel/merchandise last left the country of export for the country of import. |
|
131 |
Tax point date |
Date on which tax is due or calculated. |
|
132 |
Arrival date/time, estimated |
(2348) Date/time when carrier estimates that a means of transport should arrive at the port of discharge or place of destination. |
|
133 |
Departure date/time, estimated |
Date/time when carrier estimates that a means of transport should depart at the place of departure. |
|
134 |
Rate of exchange date/time |
Date/time on which the exchange rate was fixed. |
|
136 |
Departure date/time |
[2280] Date (and time) of departure of means of transport. |
|
137 |
Document/message date/time |
(2006) Date/time when a document/message is issued. This may include authentication. |
|
138 |
Payment date |
[2034] Date on which an amount due is made available to the creditor, in accordance with the terms of payment. |
|
140 |
Payment due date |
Date/time at which funds should be made available. |
|
143 |
Acceptance date/time of goods |
[2126] Date on which the goods are taken over by the carrier at the place of acceptance (CMR 4). |
|
147 |
Expiry date of export licence |
[2078] Date of expiry of the validity of an Export Licence. |
|
151 |
Importation date |
Date on which goods are imported, as determined by the governing Customs administration. |
|
152 |
Exportation date for textiles |
Date when imported textiles last left the country of origin for the country of importation. |
|
154 |
Acceptance date of document |
The date on which a document was accepted. |
GS1 Description: Date on which a document was, or will be, accepted. |
|
155 |
Accounting period start date |
The first date of an accounting period. |
|
156 |
Accounting period end date |
The last date of an accounting period. |
|
157 |
Validity start date |
The first date of a period for which something is valid. |
|
162 |
Release date of supplier |
Date when the supplier released goods. |
|
165 |
Tax period start date |
Date when a tax period begins. |
|
166 |
Tax period end date |
Date when a tax period ends. |
|
167 |
Charge period start date |
The charge period's first date. |
|
168 |
Charge period end date |
The charge period's last date. |
|
169 |
Lead time |
Time required between order entry till earliest goods delivery. |
|
171 |
Reference date/time |
Date/time on which the reference was issued. |
|
174 |
Advise after date/time |
The information must be advised after the date/time indicated. |
|
175 |
Advise before date/time |
The information must be advised before the date/time indicated. |
|
176 |
Advise completed date/time |
The advise has been completed at the date indicated. |
|
177 |
Advise on date/time |
The information must be advised on the date/time indicated. |
|
178 |
Arrival date/time, actual |
[2106] Date (and time) of arrival of means of transport. |
|
179 |
Booking date/time |
Date at which the booking was made. |
|
180 |
Closing date/time |
Final date for delivering cargo to a liner ship. |
|
182 |
Issue date |
Date when a document/message has been or will be issued. |
|
186 |
Departure date/time, actual |
(2280) Date (and time) of departure of means of transport. |
|
189 |
Departure date/time, scheduled |
Date (and time) of scheduled departure of means of transport. |
|
190 |
Transhipment date/time |
Date and time of the transfer of the goods from one means of transport to another. |
|
191 |
Delivery date/time, expected |
Date/time on which goods are expected to be delivered. |
|
192 |
Expiration date/time of customs document |
Date on which validity of a customs document expires. |
|
193 |
Execution date |
The date when ordered bank initiated the transaction. |
|
194 |
Start date/time |
Date/time on which a period starts. |
|
195 |
Expiry date of import licence |
[2272] Date of expiry of the validity of an Import Licence. |
|
199 |
Positioning date/time of goods |
The date and/or time the goods have to be or have been positioned. |
|
200 |
Pick-up/collection date/time of cargo |
Date/time at which the cargo is picked up. |
|
202 |
Posting date |
The date when an entry is posted to an account. |
|
203 |
Execution date/time, requested |
The date/time on which the ordered bank is requested to initiate the payment order, as specified by the originator (e.g. the date of the debit). |
|
206 |
End date/time |
Date/time on which a period (from - to) ends. |
|
209 |
Value date |
Date on which the funds are at the disposal of the beneficiary or cease to be at the disposal of the ordering customer. |
|
211 |
360/30 |
Calculation is based on year of 360 days, month of 30 days. |
|
212 |
360/28-31 |
Calculation is based on year of 360 days, month of 28-31 days. |
|
213 |
365-6/30 |
Calculation is based on year of 365-6 days, month of 30 days. |
|
214 |
365-6/28-31 |
Calculation is based on year of 365-6 days, month of 28-31 days. |
|
215 |
365/28-31 |
Calculation is based on year of 365 days, month of 28-31 days. |
|
216 |
365/30 |
Calculation is based on year of 365 days, month of 30 days. |
|
218 |
Authentication/validation date/time |
The date/time of authentication and/or validation. |
|
219 |
Crossborder date/time |
Date/time at which goods are transferred across a country border. |
|
221 |
Interest period |
Number of days used for the calculation of interests. |
|
222 |
Presentation date, latest |
Latest date for presentation of a document. |
|
223 |
Delivery date/time, deferred |
New date and time of delivery calculated on basis of a consignee's requirement (chargeable). |
|
227 |
Beneficiary's banks due date |
Date on which funds should be made available to the beneficiary's bank. |
|
231 |
Arrival date/time, earliest |
Date/time of earliest arrival of means of transport. |
|
232 |
Arrival date/time, scheduled |
Date (and time) of scheduled arrival of means of transport. |
|
234 |
Collection date/time, earliest |
The transport order may be issued before the goods are ready for picking up. This date/time indicates from when on the carrier can have access to the consignment. |
|
235 |
Collection date/time, latest |
In relation with the arrangements agreed between buyer and seller or between sender and main transport it may be necessary to specify the latest collection date/time. |
|
255 |
Availability due date |
Date when ordered items should be available at a specified location. |
|
257 |
Calculation date/time/period |
The date/time/period on which a calculation will take, or has taken, place. |
|
260 |
Valuation date (Customs) |
Date when Customs valuation was made. |
|
261 |
Release date/time |
Date/time assigned to identify the release of a set of rules, conditions, conventions, productions, etc. |
|
263 |
Invoicing period |
Period for which an invoice is issued. |
|
265 |
Due date |
The date on which some action should occur. |
|
266 |
Validation date |
The date on which something was made valid, ratified or confirmed. |
GS1 Description: The date on which the validation of a document or message has taken place. |
|
273 |
Validity period |
Dates (from/to)/period referenced documents are valid. |
|
282 |
Confirmation date lead time |
Lead time is referenced to the date of confirmation. |
|
306 |
Work period |
Period of execution of works. |
|
310 |
Received date/time |
Date/time of receipt. |
|
315 |
Agreement to pay date |
Date on which the debtor agreed to pay. |
|
321 |
Promotion date/period |
Date/period relevant for specific promotion activities. |
|
322 |
Accounting period |
Self-explanatory. |
GS1 Description: Period related to a company's accounting procedures/fiscal calendar. |
|
324 |
Processing date/period |
Date/period a specific process happened/will happen. |
|
325 |
Tax period |
Period a tax rate/tax amount etc. is applicable. |
GS1 Description: A period which is designated by tax authorities, e.g. VAT period. |
|
326 |
Charge period |
Period a specified charge is valid for. |
|
328 |
Payroll deduction date/time |
Date/time of a monetary deduction made from the salary of a person on a payroll. |
|
334 |
Status change date/time |
Date/time when a status changes. |
|
349 |
Packing end date |
Date on which packing completed. |
|
350 |
Test start date |
Date when a test has been started. |
|
351 |
Inspection date |
Date of inspection. |
|
356 |
Sales date, and or time, and or period |
The date, and or time, and or period on which a sale took place. |
|
357 |
Cancel if not published by this date |
Cancel if not published by this date. |
|
358 |
Scheduled for delivery on or after |
Scheduled for delivery on or after the specified date, and or time. |
|
359 |
Scheduled for delivery on or before |
Scheduled for delivery on or before specified date and or time. |
|
360 |
Sell by date |
The date by which a product should be sold. |
|
361 |
Best before date |
The best before date. |
|
362 |
End availability date |
The end date of availability. |
|
363 |
Total shelf life period |
A period indicating the total shelf life of a product. |
|
364 |
Minimum shelf life remaining at time of despatch period |
Period indicating the minimum shelf life remaining for a product at the time of leaving the supplier. |
|
365 |
Packaging date |
The date on which the packaging of a product took place. |
|
366 |
Inventory report date |
Date on which a inventory report is made. |
|
367 |
Previous meter reading date |
Date on which the previous reading of a meter took place. |
|
368 |
Latest meter reading date |
Date on which the latest reading of a meter took place. |
|
369 |
Date and or time of handling, estimated |
The date and or time when the handling action is estimated to take place. |
|
381 |
Product Lifespan at time of production (GS1 Code) |
The total lifespan of a product at the time of its production. |
|
382 |
Earliest sale date |
The earliest date on which the product may be made available for sale. |
|
383 |
Cancel if not shipped by this date |
Cancel the order if goods not shipped by this date. |
GS1 Description: Cancel the identified order if it has not been shipped/despatched by this date. |
|
417 |
Previous booking date/time |
Date/time at which the previous booking was made. |
|
418 |
Minimum shelf life remaining at time of receipt |
The minimum shelf life remaining at the time of receipt. |
|
419 |
Forecast period |
A period for which a forecast applies. |
GS1 Description: A validity period for a forecast. |
|
423 |
First date of ordering |
The first date on which ordering may take place. |
|
424 |
Last date of ordering |
The last date on which ordering may take place. |
|
434 |
Maturity date |
Date at which maturity occurs. |
|
447 |
Creditor's requested value date |
Date on which the creditor requests to be credited. |
|
448 |
Referenced item creation date |
Creation date of referenced item. |
|
454 |
Accounting value date |
Date against which the entry has to be legally allocated. |
|
496 |
Reinstatement date |
Identifies the date of reinstatement. |
|
506 |
Back order delivery date/time/period |
The date/time/period during which the delivery of a back order will take, or has taken, place. |
|
530 |
Fumigation date and/or time |
The date/or time on which fumigation is to occur or has taken place. |
|
531 |
Payment period |
A period of time in which a payment has been or will be made. |
|
536 |
Review date |
Date the item was or will be reviewed. |
|
541 |
First published date |
Date when material was first published. |
|
557 |
Returned date |
Date return takes place. |
GS1 Description: Date by which goods must be, or have been, returned. |
|
656 |
Age |
Length of time that a person or thing has existed. |
GS1 Description: Length of time that a person or animal has lived or a thing has existed. |
|
684 |
Deletion date |
The date on which deletion occurs. |
|
685 |
First sale date and/or time and/or period |
The first date, and/or time, and/or period a product was sold. |
|
686 |
Last sale date and/or time and/or period |
The last date, and/or time, and/or period a product was sold. |
|
706 |
File generation date and/or time |
Date and, or time of file generation. |
|
743 |
Purchase order latest possible change date |
Date identifying a point of time after which a purchase order cannot be changed. |
|
758 |
Trade item ship date/time, earliest possible |
The earliest date/time that the trade item can be shipped. |
It indicates the earliest date that the trade item can be shipped. This is independent of any specific ship-from location. |
|
759 |
Trade item ship date/time, latest possible |
The latest date/time that the trade item can be shipped. |
It indicates the latest date that the trade item can be shipped. This is independent of any specific ship-from location. |
|
760 |
Start date/time, maximum buying quantity |
The date/time from which the maximum buying quantity may be purchased. |
The start date for when the maximum buying quantity is available to the trading partner. |
|
761 |
Start date/time, minimum buying quantity |
The start date for when the minimum buying quantity is available to the trading partner. |
|
762 |
Marketing campaign end date/time, suggested |
The date and or time suggested for the marketing campaign to end. |
The date suggested by the supplier for the campaign to end. It indicates the end of a marketing campaign. |
|
763 |
Marketing campaign start date/time, suggested |
The date and or time suggested for the marketing campaign to start. |
The date suggested by the supplier for the campaign to start. It indicates the beginning of a marketing campaign. |
|
764 |
Start availability date |
The start date of availability. |
Indicates the start date of the trade item's seasonal availability. |
|
765 |
Seasonal availabilty calendar year |
The calendar year of the season in which the trade item is available. |
|
766 |
Goods pickup lead time |
Minimum time required between order entry and goods release for pick-up. |
Time (in weeks, days, hours …) required between order entry and the earliest goods release (use for pick-up, not use for delivery). |
|
767 |
Change date/time, latest |
Most recent date and/or time that the information has been changed. |
A system generated value identifying the date and time a record was last updated. |
|
768 |
End date/time, maximum buying quantity |
The date and/or time until which the maximum buying quantity may be purchased. |
The end date for when the maximum buying quantity is no longer available to the trading partner. |
|
769 |
End dat/time, minimum buying quantity |
The date and/or time until which the minimum buying quantity may be purchased. |
The end date for when the minimum buying quantity is no longer available to the trading partner. |
|
770 |
End date/time of exclusivity |
The date and/or time until which a product is exclusive. |
The Date & Time at which a product is no longer exclusive to that trading partner. |
|
772 |
Handling start date and/or time, actual |
The actual date and/or time when the start of the handling action takes place. |
|
773 |
Handling end date and/or time, estimated |
The date and/or time when the end of the handling action is estimated to take place. |
|
774 |
Handling end date and/or time, actual |
The actual date and/or time when the end of the handling action takes place. |
|
775 |
Minimum product lifespan for consumer |
The minimum life span of the product remaining after selling it to the consumer, i.e. between the "sell by date" and the "use by date" of the product. |
|
789 |
Opened trade item life span |
The number of days the trade item that had been opened can remain on the shelf and must then be removed. |
|
21E |
End validity date (GS1 Code) |
Date indicating the end date of a validity period. |
|
40E |
Next status date (GS1 Code) |
The next date on which a status report will be provided. |
|
41E |
Product lifespan from time of production (GS1 Code) |
An indication of the lifespan of a product from its time of production. |
|
44E |
Connection date/time (GS1 Code) |
The date/time on which a service was connected, e.g. telephone, water, etc. |
|
45E |
Disconnection date/time (GS1 Code) |
The date/time on which a service was disconnected, e.g. telephone, water, etc. |
|
46E |
Order completion date/time (GS1 Code) |
The date/time on which an order was completed. |
|
50E |
Empty equipment required date/time/period (GS1 Code) |
Date on which empty equipment is required. |
|
54E |
Stuffing date/time (GS1 Code) |
The date/time on which the stuffing of a container is to take place, or has taken place. |
|
55E |
Un-stuffing date/time (GS1 Code) |
The date/time on which the un-stuffing of a container is to take place, or has taken place. |
|
61B |
Cancel if not delivered by this date unless title not published at time (GS1 Code) |
Cancel the product ordered if it has not been delivered by this date unless it had not been published at the time of order. |
|
63B |
Latest availability date if not yet despatched (GS1 Code) |
The latest availability date required for a product or order if it has not already been despatched. |
|
90E |
Product sterilisation date (GS1 Code) |
Date on which a product was sterilised. |
|
91E |
First freezing date (GS1 Code) |
Date on which a product was first frozen. |
|
92E |
Pension deduction payment date (GS1 Code) |
Date when the deduction was made from the salary of the employee. |
|
93E |
Professional risk deduction payment date (GS1 Code) |
Date when the risk deduction was made from the salary of the employee. |
|
94E |
Health care deduction payment date (GS1 Code) |
Date when health care deduction was made. |
|
96E |
Stock cover period (GS1 Code) |
A period of time when all stocks are expected to cover demand for a product. |
|
98E |
Discharge date/time, start (GS1 Code) |
Date/time when all discharge operations on the transport means have actually been started. |
|
X11 |
Before date (GS1 Code) |
The specified before date. |
|
X12 |
After date (GS1 Code) |
The specified after date. |
|
X13 |
Expect to ship by (GS1 Code) |
The consignement is expected to be shipped by this date and/or time. |
|
X14 |
Requested for delivery week commencing (GS1 Code) |
Code requesting delivery of an order or order line during a specified week. |
|
X16 |
Product ageing duration, maximum (GS1 Code) |
Maximum period of time during which the product is ageing. |
|
X17 |
Product ageing duration, minimum (GS1 Code) |
Minimum period of time during which the product is ageing. |
|
X18 |
Maturity date, optimal (GS1 Code) |
Date at which optimal maturity occurs. |
|
X19 |
Material Safety Data Sheet issue date (GS1 Code) |
A date when a Material Safety Data Sheet has been or will be issued. |
|
X20 |
Slaughter date/time (GS1 Code) |
Date/time of slaughtering of an animal. |
|
X21 |
Animal Birth date/time (GS1 Code) |
Date/time when an animal was born. For traceability purposes. |
|
X49 |
Seasonal availability end date (GS1 Code) |
Indicates the end date of the trade item's seasonal availability. |
|
XF2 |
Date of issue and maturity (SWIFT Code) |
Date when a document/message has been issued and becomes mature. |
|
YB9 |
Total credits (SWIFT Code) |
The total value of credits to a financial account. |
|